Summary
Overview
Work History
Education
Skills
Timeline
Generic

Tebogo Sediti

DIPLOMA IN BUILDING CONSTRUCTION
Ghanzi

Summary

Experienced construction professional with strong focus on team collaboration and achieving results. Skilled in site management, safety protocols, and project coordination. Known for reliability and adaptability to changing needs, ensuring smooth operations and high-quality outcomes. Adept at leading teams, problem-solving, and maintaining high standards.

Overview

14
14
years of professional experience
2
2
Languages

Work History

Civil Site Supervisor

SANDVELD SOLAR PARK
02.2025 - Current
  • Reduced project costs through efficient materials management and accurate site measurements.
  • Implemented and maintained comprehensive quality control procedures to minimize defects and ensure adherence to established industry standards consistently.
  • Ensured timely completion of projects by coordinating daily work schedules for team members and subcontractors.
  • Proactively identified potential risks, implementing risk mitigation strategies to reduce their impact on project timelines, costs, or quality levels.
  • Promoted cost savings by negotiating favorable contracts with vendors, suppliers, and subcontractors for materials and services required onsite.
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.

Architectural Technologist

DONN ARCHITECTS(PTY)LTD
10.2018 - 02.2025
  • Reviewed buildings already in use to determine areas in need of improvement for current and future designs.
  • Conducted comprehensive quality control reviews on architectural drawings to minimize errors during construction phase.
  • Reduced construction costs by identifying innovative materials and techniques for use in architectural projects.
  • Contributed to successful project completion by coordinating closely with contractors during the construction phase.
  • Optimized space utilization through detailed analysis of client requirements and efficient space planning strategies.
  • Enabled better decision-making by providing architects with up-to-date information on material availability, cost estimates, and construction methodologies.
  • Worked with licensing, permitting, planning and inspection authorities to evaluate and resolve concerns.
  • Provided advice on methods of remodeling, repair, recycling and refurbishments to better utilize space and satisfy customers.
  • Created physical and computer-based models and visual aids as part of concept and design processes.
  • Assisted in the development of building codes and regulations to ensure safety and accessibility for all occupants.
  • Delivered high-quality technical drawings using AutoCAD and Archicad, ensuring accurate representation of architectural designs.
  • Visited, measured and evaluated construction sites.
  • Produced drawings, specifications and submittal packages.

Site Agent

LESENOTSWE HOLDINGS (PTY)LTD
10.2016 - 11.2016
  • Ensured quality workmanship with thorough inspections and adherence to established standards and guidelines.
  • Maintained accurate records of all site activities like daily logs which ensured seamless handover at the end of each shift.
  • Maintained strong client relationships by providing regular updates on project status and addressing concerns promptly.
  • Achieved timely completion of projects through diligent scheduling, planning, and progress tracking.


Architectural Technologist

BRAIN WORKS ARKITECTS (PTY) LTD
10.2015 - 09.2016
  • Delivered high-quality technical drawings using AutoCAD and Archicad, ensuring accurate representation of architectural designs.
  • Utilized architectural and technical knowledge to develop creative solutions to design problems.
  • Collaborated with clients to refine design concepts based on their preferences, needs, and budget constraints.
  • Analyzed site conditions and conducted feasibility studies for optimal building placement and orientation.
  • Evaluated information provided by architects and system subcontractors and created accurate drawings according to measurements and specifications.
  • Explained drawings to production or construction teams and adjusted as necessary.
  • Created, printed, and modified drawings in AutoCAD and Archicad.

Tiler and Assistant Site Foreman

HELP U CONSTRUCTION BOTSWANA (PTY)LTD
05.2014 - 07.2014
  • Achieved consistent client commendations for exceptional attention to detail in complex tiling designs.
  • Strengthened customer relationships by providing transparent communication throughout each stage of the tiling process.
  • . Actively participated in professional workshops and training seminars to continuously enhance tiling skills and industry knowledge.
  • Streamlined project completion timelines with meticulous planning, coordination, and scheduling efforts.
  • Maintained a clean work environment during all stages of the tiling process, minimizing disruptions to clients'' daily routines.
  • Mastered diverse tiling materials such as ceramic, porcelain, glass, stone, marble, granite allowing for versatile application capabilities across various settings.
  • Reduced material waste by accurately estimating project needs and optimizing tile cutting techniques.

Clerk of Works (Attachment)

SOUTH EAST DISTRICT COUNCIL
06.2011 - 08.2011


  • Maintained detailed records of construction progress, including daily reports, photographs, and site meeting minutes.
  • Played a crucial role in the successful completion of numerous construction projects, contributing to the company''s overall reputation for delivering high-quality results within budget and schedule constraints.
  • Improved construction quality by conducting regular site inspections and ensuring adherence to project specifications.
  • Provided valuable input during design phases to optimize constructability while adhering to client requirements.
  • Enhanced project efficiency by monitoring progress, identifying issues, and recommending corrective actions.

Education

High School Diploma -

NEW ERA COLLEGE
Gaborone, Botswana
04.2001 -

Skills

Scheduling and planning

Timeline

Civil Site Supervisor

SANDVELD SOLAR PARK
02.2025 - Current

Architectural Technologist

DONN ARCHITECTS(PTY)LTD
10.2018 - 02.2025

Site Agent

LESENOTSWE HOLDINGS (PTY)LTD
10.2016 - 11.2016

Architectural Technologist

BRAIN WORKS ARKITECTS (PTY) LTD
10.2015 - 09.2016

Tiler and Assistant Site Foreman

HELP U CONSTRUCTION BOTSWANA (PTY)LTD
05.2014 - 07.2014

Clerk of Works (Attachment)

SOUTH EAST DISTRICT COUNCIL
06.2011 - 08.2011

High School Diploma -

NEW ERA COLLEGE
04.2001 -
Tebogo SeditiDIPLOMA IN BUILDING CONSTRUCTION